![]() In this context, while the primary audience may be inspection and materials engineering personnel, other stakeholders who are likely to be involved should be familiar with the concepts and principles embodied in the RBI methodology to the extent necessary for them to understand the risk assessment process and to be able to accept the results.Ĥ Basic Risk Assessment Concepts 4.1 What is Risk? Risk is the combination of the probability of some event occurring during a time period of interest and the consequences (generally negative) associated with the event. RBI requires the commitment and cooperation of the total operating organization. inspection plans, replacement/upgrading recommendations, other mitigation activities, etc.) may rest with more than one segment of the organization. Implementation of the resulting RBI product (e.g. RBI requires the involvement of various segments of the organization such as engineering, maintenance, and operations. However, while an organization’s inspection and materials engineering groups may champion the RBI initiative, RBI is not exclusively an inspection activity. The primary audience for this RP is inspection and engineering personnel who are responsible for the mechanical integrity and operability of equipment covered by this RP. ![]() API RP 580 pdf free download.Risk-based Inspection. ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |